× Kinomap, Be on Track!
Ardi Al-Wayshappy Por Ardi Al-Wayshappy

16.77 mi
01:05:30
427 ft

- Visualizar en Kinomap

Doha Link Sheikh Jaber Causeway Bridge Kuwait

The Sheikh Jaber Al-Ahmad Al-Sabah Causeway is a new bridge in Kuwait opened on 1 May 2019. The construction cost arround US$3 billion that spans the Bay of Kuwait in two directions : Main Link, which connects Kuwait City with the future Silk City; and Doha Link, which connects Kuwait City with Doha and the Kuwait Entertainment City. The Main Link is the 4th longest road bridge in the world at 36.14 km. Both bridges have a combined length of 48.5 kilometers. This cycling video was taken on the Doha Link during the Lockdown due to Covid-19 20 Apr 2020.

Clasificación del mejor tiempo

# Usuario Tiempo Fecha Equipo Marca
En esta clasificación, solo se visualizan los entrenamientos realizados y terminados completamente un una máquina interactiva en el modo Desafío

Puedes probar nuestra aplicación completa y gratuitamente y desafiar a los miembros de la comunidad.

iOS Android ¿Ningún acceso a Google Play? Descargar el APK ahora
¿Satisfecho?

Accede a todas las funciones y vídeos por solo $11.99/ mensuales

Suscríbete ahora
Visualizar en Kinomap