× Kinomap, Be on Track!
Ardi Al-Wayshappy Par Ardi Al-Wayshappy

16.77 mi
01:05:30
427 ft

- Regarder sur Kinomap

Doha Link Sheikh Jaber Causeway Bridge Kuwait

The Sheikh Jaber Al-Ahmad Al-Sabah Causeway is a new bridge in Kuwait opened on 1 May 2019. The construction cost arround US$3 billion that spans the Bay of Kuwait in two directions : Main Link, which connects Kuwait City with the future Silk City; and Doha Link, which connects Kuwait City with Doha and the Kuwait Entertainment City. The Main Link is the 4th longest road bridge in the world at 36.14 km. Both bridges have a combined length of 48.5 kilometers. This cycling video was taken on the Doha Link during the Lockdown due to Covid-19 20 Apr 2020.

Classement des meilleurs temps

# Utilisateur Temps Date Equipement Marque
Ce classement tient compte uniquement des entrainements terminés et réalisés en mode défi, sur une machine interactive

Vous pouvez tester notre application entièrement et gratuitement dès maintenant et défiez les autres membres de la communauté pendant 7 jours.

iOS Android Pas d'accès au Google Play ? Télécharger notre APK
Satisfait ?

Profitez de toutes les fonctionnalités ainsi que de toutes les vidéos à partir de $11.99/mois

S'abonner
Regarder sur Kinomap