The Sheikh Jaber Al-Ahmad Al-Sabah Causeway is a new bridge in Kuwait opened on 1 May 2019. The construction cost arround US$3 billion that spans the Bay of Kuwait in two directions : Main Link, which connects Kuwait City with the future Silk City; and Doha Link, which connects Kuwait City with Doha and the Kuwait Entertainment City. The Main Link is the 4th longest road bridge in the world at 36.14 km. Both bridges have a combined length of 48.5 kilometers. This cycling video was taken on the Doha Link during the Lockdown due to Covid-19 20 Apr 2020.