× Kinomap, Be on Track!
Ardi Al-Wayshappy Ardi Al-Wayshappy

16.77 mi
01:05:30
427 ft

- 关注Kinomap

Doha Link Sheikh Jaber Causeway Bridge Kuwait

The Sheikh Jaber Al-Ahmad Al-Sabah Causeway is a new bridge in Kuwait opened on 1 May 2019. The construction cost arround US$3 billion that spans the Bay of Kuwait in two directions : Main Link, which connects Kuwait City with the future Silk City; and Doha Link, which connects Kuwait City with Doha and the Kuwait Entertainment City. The Main Link is the 4th longest road bridge in the world at 36.14 km. Both bridges have a combined length of 48.5 kilometers. This cycling video was taken on the Doha Link during the Lockdown due to Covid-19 20 Apr 2020.

最佳时间排名

# 用户 时间 日期 器材 品牌
只有完全完成并在挑战模式下练习的训练才会显示在此排名中

您可以免费试用我们的应用 并挑战社区成员

iOS Android 无法进入Google Play? 立即下载APK
满意?

获取所有功能和视频仅$11.99/月

立即订阅
关注Kinomap